资料文档目录

8.11Monitoring-Based Commissioning and Retro-Commissioning 基于监测的调试与既有建筑再调试

Monitoring-Based Commissioning and Retro-Commissioning

基于监测的调试与既有建筑再调试

Energy targets and other performance goals can be undermined by new or unexpected occupancy patterns, construction defects, equipment malfunctions, or deferred maintenance. The performance of most systems degrades with time, so a building’s energy use and emissions will increase unless operators regularly check in.
能源目标与其他性能指标,可能会被新的或意外的使用模式、施工缺陷、设备故障或维护滞后所影响。大多数系统的性能会随时间衰减,因此如果运营方不进行定期检查,建筑的能耗与排放将持续上升。

Green Building Strategies 绿色建筑策略

Green buildings sustain low energy use by ensuring that a building continues to meet its fundamental operating requirements. This is done through two additional types of Cx:
绿色建筑通过确保建筑持续满足基础运行要求,维持低能耗水平。这主要通过两类补充调试方式实现:
  • Monitoring-based commissioning, which is a way to maintain and continuously improve project performance over time by gathering information about energy performance and using this information in a cycle of analysis, problem-solving, staff training and implementation, and further monitoring. Sources of information include feedback from occupants and performance data from energy meters, building automation systems, or utility bills. Monitoring-based commissioning enables building operators to identify operational issues as they occur, facilitating achievement of the project’s performance goals on an ongoing basis.
基于监测的调试:通过收集能源性能数据,并在分析、问题解决、人员培训与实施、持续监测的循环中应用这些信息,以长期维持并持续提升项目性能。信息来源包括使用者反馈、能源计量表数据、楼宇自动化系统数据或公用事业账单。基于监测的调试可帮助运营方在问题发生时及时识别,从而持续达成项目性能目标。
  • Retro-commissioning, which is commissioning that is provided by a third party for an existing project that includes assessment and testing of building systems and documentation of any measures that are needed to improve performance. Retro-commissioning often includes financial analysis to help teams prioritize investment in process adjustments and capital improvements.
既有建筑再调试:由第三方为既有项目提供的调试服务,包括建筑系统评估与测试,并记录所有性能提升所需的措施。再调试通常包含财务分析,帮助团队对流程优化与资本改进的投资进行优先级排序。

Examples of how monitoring-based commissioning can improve performance

基于监测的调试提升性能的示例
  • Calibrating sensors 传感器校准
  • Cleaning equipment and replacing parts 设备清洁与部件更换
  • Discovering and addressing leaks 发现并修复泄漏问题
  • Completing checklists and training staff 完成检查清单并开展人员培训
8.11Monitoring-Based Commissioning and Retro-Commissioning   基于监测的调试与既有建筑再调试

Quality of life

Monitoring-based commissioning and retro-commissioning have a strong return on investment. In fact, research found that energy savings from existing building commissioning was even higher than new construction commissioning.
基于监测的调试与既有建筑再调试具有极高的投资回报率。研究表明,既有建筑调试带来的节能效果,甚至高于新建项目的调试。
关键词: