8.10 Commissioning 调试 / 认证

Commissioning 调试


Project goals around energy use are documented in the owner's project requirements (OPR), a written document that details the ideas, concepts, and criteria the owner has prioritized. The OPR is developed early in the integrative process and considered throughout the building design and construction process, and it becomes the reference for evaluating the performance of the project while it is in use. To reduce energy use, projects need to go beyond setting goals; they need to ensure the systems actually perform as intended.
项目的能源相关目标需记录在业主项目需求文件(OPR)中,该文件明确了业主优先关注的理念、概念与技术标准。OPR 在整合设计阶段早期编制,并贯穿建筑设计与施工全过程,是建筑投入使用后性能评估的依据。若要实现能耗降低,项目不能仅停留在设定目标,还需确保系统实际运行效果与设计预期一致。

Green Building Strategies 绿色建筑策略

Green buildings ensure systems perform as intended through commissioning (Cx), the process of verifying and documenting that a project and all its systems and assemblies are planned, designed, installed, tested, operated, and maintained according to project requirements.
绿色建筑通过调试(Cx)确保系统按预期运行。调试是一套验证与记录流程,确认项目及其所有系统、组件的规划、设计、安装、测试、运行与维护均符合项目需求。

The commissioning process 调试流程

  1. Develop a Cx plan 制定调试计划
  2. Review design 设计审查
  3. Observe installation 施工安装监督
  4. Perform testing and verification 测试与验证
  5. Prepare Cx reports 编制调试报告
  6. Ongoing monitoring and maintenance 持续监测与维护
8.10  Commissioning 调试 / 认证

Cx improves energy performance and limits greenhouse gas emissions by verifying that systems are operating per the OPR. Just because energy efficiency strategies are incorporated into the design and construction documents doesn't mean they always work as intended. Cx helps ensure that building systems work as intended.
调试通过验证系统运行符合 OPR 要求,提升能源性能并减少温室气体排放。能效策略纳入设计与施工文件,并不代表其必然能按预期运行,调试正是确保建筑系统按设计目标发挥作用的关键环节。
Project teams engage a commissioning provider (CxP) to complete these tasks. This provider also assists in the development of the OPR and may be responsible for:
  • Design reviews
  • Proactive quality control during construction
  • Tests of the HVAC, electrical, and plumbing systems, plus their sensors and controls
项目团队会聘请调试服务方(CxP)完成上述工作。调试方也会协助编制 OPR 文件,并负责:
  • 设计审查
  • 施工阶段的主动质量控制
  • 暖通空调、电气、给排水系统及其传感器与控制设备的测试
For new construction, major renovations, and energy retrofits that impact envelope performance, the Cx process includes building enclosure commissioning (BECx), which helps ensure that components of the building envelope are installed and functioning properly.
对于新建项目、大型改造及影响围护结构性能的节能改造项目,调试流程包含建筑围护结构调试(BECx),用于确保围护结构各构件安装与功能符合设计要求。

Quality of life

Numerous studies have shown Cx has a very good return on investment.
大量研究表明,调试具有极高的投资回报率。