Project Priorities

1-10 pts
PR - Project Priorities / 项目优先事项 (1-10 pts / 1-10分)
PRc1 Project Priorities
1-10 pts / 1-10分
Intent
To encourage projects to address geographically specific environmental, social, and economic priorities and to reward exemplary performance and innovative strategies.
意图
鼓励项目解决地理特定的环境、社会和经济优先事项,并奖励示范性绩效和创新策略。
Requirements
Earn points through any combination of the following pathways:
要求
通过以下任一路径组合获得分数:
Pathways
Pathway / 途径Description / 描述Max Points / 最高分值
Regional Priority / 区域优先Address USGBC-identified regional environmental priorities. 1 pt per regional priority credit, up to 4 pts.4
Project-Type Priorities / 项目类型优先Address priorities specific to the project type as identified by USGBC. 1 pt per priority achieved.4
Exemplary Performance / 示范性绩效Achieve exemplary performance levels beyond LEED credit thresholds. 1 pt per exemplary achievement.3
Pilot Credits / 试点积分Achieve pilot credits approved by USGBC for innovative strategies. 1 pt per pilot credit.3
Innovative Strategies / 创新策略Implement innovative strategies not addressed by LEED credits that demonstrate measurable environmental benefit. 1 pt per strategy.3
LEED AP / LEED认证专业人员Project team includes a LEED AP with specialty credential. 1 pt.1
途径
途径描述最高分值
区域优先解决USGBC识别的区域环境优先事项。每个区域优先积分1分,最多4分。4
项目类型优先解决USGBC识别的项目类型特定优先事项。每项1分。4
示范性绩效达到超越LEED积分阈值的示范性绩效水平。每项示范性成就1分。3
试点积分获得USGBC批准的创新策略试点积分。每个试点积分1分。3
创新策略实施LEED积分未涵盖但展示可衡量环境效益的创新策略。每项策略1分。3
LEED认证专业人员项目团队包含持有专业认证的LEED AP。1分。1